Skip to content. | Skip to navigation

Formwork and Scaffolding for construction sites

News

Megaproject in the Heart of Flushing, NYC

Megaproject in the Heart of Flushing, NYC

Sep 21, 2018

Tangram Plaza is a mixed-used development project covering more than 110,000 m² in the heart of Flushing, Queens. It includes the construction of 1,200 subterranean parking spaces, two residential towers with 220 flats, a Class A office building offering a surface area over 32,000 m², retail space, and a hotel with 240 rooms available.

Read more

Młociny Large Shopping Centre, Warsaw

Młociny Large Shopping Centre, Warsaw

Sep 06, 2018

ULMA provided a comprehensive formwork and scaffolding solution to help build one of the largest shopping centres in Warsaw. The compatibility between the two systems provided savings in materials, costs, and time, meaning not only profitability for the client, but also maximum safety as well.

Read more

New Offices for Publishing House Axel Springer SE

New Offices for Publishing House Axel Springer SE

Jul 26, 2018

The 50th anniversary of the emblematic Axel Springer skyscraper in Berlin is the milestone motivating the construction of new offices for the company, planned to accommodate 3,500 workers and be fully completed in 2020.

Read more

New Ross, the longest extradosed bridge in the world

New Ross, the longest extradosed bridge in the world

Jul 10, 2018

This section of the N25 will become a crucial component of Ireland’s transportation infrastructure, and part of the Trans-European Transport Network (TEN-T). The project will improve access to the east side of the island, as well as reduce congestion and accidents in the area.

Read more

Tight building schedules, adverse weather conditions and high altitude at Pachachaca

Tight building schedules, adverse weather conditions and high altitude at Pachachaca

Jun 15, 2018

ULMA responded with careful planning and project management paired with high quality products to demanding conditions at Pachachaca Lime Plant, Peru.

Read more

ULMA is awarded the PEFC certificate in Spain in recognition of its commitment to the environment

ULMA is awarded the PEFC certificate in Spain in recognition of its commitment to the environment

May 18, 2018

By obtaining the PEFC (Programme for the Endorsement of Forest Certification Schemes) certification, ULMA Construction has taken another step forwards, securing its commitment to combining its business activity with social welfare in an environmentally-friendly way.

Read more

Saving time and space with the pre-assembled HWS

Saving time and space with the pre-assembled HWS

May 04, 2018

The Provost Square project in New Jersey (USA), the panels have been pre-assembled at ULMA facilities, optimising their size for transport and increased efficiency in situ.

Read more

Tauron Arena, the largest sports arena in Poland

Tauron Arena, the largest sports arena in Poland

Mar 28, 2018

This was a comprehensive project requiring many distinct solutions, the most spectacular of which was the shoring for the upper ring, set at a height of 40 m with a circumference of 400 m.

Read more

MK Standard solution for Santa Rosa Tunnel, Lima, Peru

MK Standard solution for Santa Rosa Tunnel, Lima, Peru

Mar 13, 2018

With standard MK carriages, two tunnels have been constructed in a flexible manner that considerably reduced costs for the customer.

Read more

Viaduct 21, Expressway S7, Poland

Viaduct 21, Expressway S7, Poland

Feb 26, 2018

Stretching 992 m in length, Viaduct 21, which forms a part of Expressway S7, will join the Polish regions of Lubień and Rabka Zdrój.

Read more

HWS Perimeter Safety Screen in the Centre of Utrecht, Netherlands

HWS Perimeter Safety Screen in the Centre of Utrecht, Netherlands

Feb 07, 2018

Located in the centre of the city, near Utrecht Central Station, the World Trade Centre (WTC) boast 32,000 m² of surface area, measuring 70 m in height spread across 19 storeys. WTC Utrecht forms part of the World Trade Centre Association (WTCA), the global organisation created to promote international commerce and commercial relationships.

Read more

Renovation of The Agora Building, Spain

Renovation of The Agora Building, Spain

Jan 25, 2018

Located in the City of Arts and Sciences in Valencia, The Agora is an almost completely translucent multiuse space full of natural light built in the shape of an ellipse with pointed ends. Measuring 100 m by 65 m and 68 m in height, the building also features slats forming a brise soleil that reaches 85 m in height.

Read more

The first step in the modernisation for PETROPERÚ

The first step in the modernisation for PETROPERÚ

Jan 11, 2018

The Modernisation Project for the Talara Refinery envisions the creation of new productive units and the implementation of new systems and procedures that will increase both capacity and efficiency.

Read more

New Hotel in the Manhattan Financial District

New Hotel in the Manhattan Financial District

Dec 13, 2017

Over the past decade, innovative buildings have been literally transforming the landscape of finance in New York City.

Read more

High Speed Rail Network, Spain

High Speed Rail Network, Spain

Nov 28, 2017

In the face of both precipitous terrain and strict requirements for railway construction, we relied on the flexibility and versatility of ULMA formwork systems to meet the challenges presented.

Read more

Sustainability in the center of Warsaw

Sustainability in the center of Warsaw

Nov 06, 2017

ULMA self-climbing systems made it possible to complete the two cores of EuroCentrum Complex building quickly and efficiently.

Read more

Arch bridge over Stradomka River

Arch bridge over Stradomka River

Oct 16, 2017

In order to build this bridge, it’s been employed shoring systems of different heights, thus achieving high levels of efficiency throughout the entire construction process.

Read more

ULMA takes part on the newly-opened Wanda Metropolitano Stadium in Madrid

ULMA takes part on the newly-opened Wanda Metropolitano Stadium in Madrid

Sep 27, 2017

The transformation of the old stadium La Peineta designed for 20,000 spectators into state-of-the-art facilities for 68,000 is a great technical and logistical challenge. The challenge was overcome thanks to careful planning and efficient material rotation.

Read more

Tight deadlines and quality standards for Schaumburg Clinic, Germany

Tight deadlines and quality standards for Schaumburg Clinic, Germany

Sep 13, 2017

Using the CC-4 formwork system it has been able to pour 30,000 m3 of concrete in situ in little more than 6 months.

Read more

Construction in record time with T-60 Shoring Towers: Lusail Boulevard Tunnel, Qatar

Construction in record time with T-60 Shoring Towers: Lusail Boulevard Tunnel, Qatar

Aug 30, 2017

This project consists of the construction of a cut-and-cover road-rail tunnel, including the mechanical systems and services necessary for the A3 Expressway. The tunnel stretches 655 m in length, and is 45 m wide with three separate tubes. The central tube is dedicated to rail traffic, with two lines running in each direction. The project required 300,000 m³ of concrete.

Read more

Javier Prado Tower, a Sustainable Building in Lima

Javier Prado Tower, a Sustainable Building in Lima

Aug 02, 2017

Located in the financial centre of Peru, this commercial tower measures more than 90 m in height, making it one of the tallest buildings in Lima. It features 27 floors aboveground with cutting-edge design, along with nine stories belowground covering 82,401.32 m².

Read more

New York’s first and only retail shopping destination

New York’s first and only retail shopping destination

Jul 20, 2017

Situated at the Staten Island Ferry Terminal, a 20-minute boat ride from Manhattan, Empire Outlets is set to become the retail centrepiece of New York City.

Read more

Wide range of MK System capabilities at Interlomas Viaduct, Mexico

Wide range of MK System capabilities at Interlomas Viaduct, Mexico

Jul 05, 2017

Forming part of Mexico City’s transportation infrastructure development plan, this viaduct reaches 227 m in length to connect the residential and commercial area Interlomas with the Naucalpan-Toluca Motorway.

Read more

ULMA comprehensive solutions for the expansion of the Jaworzno III Power Plant

ULMA comprehensive solutions for the expansion of the Jaworzno III Power Plant

Jun 22, 2017

The new addition to Jaworzno III Power Plant, Poland, will boast a 910 MW production capacity.

Read more

ULMA Solutions for the Widest Tunnel on the Iberian Peninsula

ULMA Solutions for the Widest Tunnel on the Iberian Peninsula

Jun 08, 2017

Measuring 19.2 m in width, this mine tunnel is to become the widest on the entire Iberian Peninsula.

Read more

Detailed technical study of the unique building geometry

Detailed technical study of the unique building geometry

May 25, 2017

Before assembling the multidirectional BRIO scaffolding, there’s been undertook a detailed technical study of the unique building geometry, so as to adapt to it as efficiently as possible.

Read more

Comprehensive formwork and scaffolding systems at Riyadh Metro

Comprehensive formwork and scaffolding systems at Riyadh Metro

May 05, 2017

Riyadh is a Saudi Arabian city that – like any big city anywhere in the world – is home to a high density of vehicular traffic. An underground rail network was built in order to reduce traffic and improve both access to and communication between the city centre, the airport, and the financial district.

Read more

Spectacular views of Manhattan from Harborside Tower

Spectacular views of Manhattan from Harborside Tower

Apr 10, 2017

A series of buildings are being constructed along the banks of the Hudson River with spectacular views of Manhattan. The Harborside Tower was designed with 69 storeys, 763 residences, and a total height of 214 m. It is now the tallest residential building in New Jersey.

Read more

Hisgaura Bridge, the longest cable-stayed bridge in South America

Hisgaura Bridge, the longest cable-stayed bridge in South America

Mar 21, 2017

Traversing challenging terrain, the development project along the Málaga—Los Curos Motorway will improve transportation between the regions of Boyacá and Santander, Colombia. The central element of these improvements is the Hisgaura Bridge, stretching 653 m in length with a single span reaching 400 m, will become in 2018 the longest cable-stayed bridge in South America.

Read more

New Lock on the Po River, Italy

New Lock on the Po River, Italy

Mar 09, 2017

Meticulous study and planning paired with careful ULMA product rotation provided for optimal performance and a reduction in the tasks necessary to perform in situ.

Read more