Skip to content. | Skip to navigation

TS-32 road tunnel, Poland

The TS-32 cut-and-cover tunnel is being constructed on the S3 motorway construction site in Poland. The tunnel will consist of two bays, each 320 metres long. ULMA has supplied comprehensive formwork systems for this project, such as the carriage which is used to carry out the tunnel vault. The mobile structure has allowed the contractor to increase efficiency.

We have formwork solutions for both cut-and-cover tunnels and mine tunnels. Contact us without any obligation.

Contact us