Skip to content. | Skip to navigation

Bridge over Neris river in Kaunas, August 2021, Lithuania

An integral part of the project in Kaunas is the construction of a new Kleboniškis bridge across the Neris, which will significantly improve local and long-distance communication. The impressive length of the building structure, reaching up to 352 meters, and the rapid pace of work pose a number of technical challenges. Non-standard solutions require an innovative and bold approach. UAB ULMA CONSTRUCCION BALTIC, in cooperation with the general contractor AB Kauno tiltai, designed and applied comprehensive formwork solutions, using MK formwork system for the construction of the bridge panel.

At ULMA, we have extensive experience in bridge construction. We have bridge formwork for all types of projects. Contact us.

Contact us