ALLENSTOWN TANKS, NH

Two new tanks were added to the wastewater treatment plant in Allenstown, New Hampshire.
ULMA Construction successfully supported the expansion of the Allenstown Regional Wastewater Treatment Facility (WWTF) in New Hampshire by providing high-efficiency formwork solutions for two new municipal treatment tanks.

Description

The Allenstown Regional Wastewater Treatment Facility (WWTF) is a municipal treatment plant located in Allenstown, Merrimack County, New Hampshire. Serving a population of about 8,750, it is classified as a small to medium-sized facility under U.S. Environmental Protection Agency (EPA) guidelines. Recently two new tanks have been constructed in the facility due to the demand for an increased population in Allenstown. Tanks’ dimensions are 47 ft in diameter and 20 ft tall. With finishing the construction of new tanks, the facility’s capacity will be increasing around 35%. And the whole project is expected to be finished by the end of 2026.

 

ULMA Solutions

ULMA Construction provided the MK-C FORM system which was utilized to efficiently form the curved tank walls at this facility. The MK-C FORM system provided a consistent circular profile with a high-quality concrete finish, thanks to our UM-PLY Phenolic plywood. A half tank profile was preassembled in the yard at the request of the customer which offers professional performance and care-free experience on site. They cycled 4 times in this project. Customer is well satisfied with easy setup and stripping, labor saving solutions, and also the concrete finish.