Cantilever formwork for steel composite bridges and partially pre-cast concrete bridges. Highlights: configurable for each project. Allows quick work cycles.
Cantilever formwork for steel composite bridges and partially pre-cast concrete bridges. Highlights: configurable for each project. Allows quick work cycles.

The Composite Bridge Formwork Carriage MK is a flexible and efficient formwork systemfocused mainly on the construction of metal bridges and partially precast bridges where concreting the bridge deck flanges is necessary 

General components: 

  • Main structure that receives the concrete pouring loads
  • Bracing to counteract the effects of wind and transverse movements
  • Formwork that is in contact with the concreteENKOFORM HMK
  • The assembly is supported on a beam serving as rail, which moves onto the rolling components arranged along the entire bridge
  • The size and design varies depending on the cantilever of the bridge flanges. Lightweight flange formwork carriages can be configured for the construction of small deck flanges or heavy carriages for the construction of large deck flanges
  • Safety and access components: working platforms, safety handrails, etc., depending on the requirements of each project
  • Repeatability of operations. Quick work cycles. Weekly cycles of 15-20 linear meters
  • Working mainly on the bridge deck
  • Pre-assembly of sets on the ground
  • It can be used for steel and concrete bridge decks
  • The lower deck flange form carrier does not occupy space on top of the bridge deck, which can thus be used for other works